Terraced house Wetzikon, 1979
Gas heating replaced by a ground-source heat pump: the 1979 terraced house in Wetzikon got a 180 m borehole and has heated without fossil fuels since winter.

35 °C
Flow temp
Saving
CHF 1,900 per year
Before
Gas heating from 2004, 60 °C
After
Brine-to-water heat pump, 180 m borehole
Build time
3 weeks incl. drilling
Subsidy
CHF 14,200
Flow temp
35 °C

Report
What we did
<p>The narrow garden had no room for an outdoor unit the neighbours would not hear, so the borehole was the quieter solution. We obtained the permit from the canton, and the drilling took two days.</p><p>Because the house already had underfloor heating, 35 degrees is enough. In summer the borehole gently cools the rooms at no extra cost.</p>
“
The drilling took two days. Afterwards the garden looked just like before.
Sandra and Luca Meier, Wetzikon
From the Zurich Oberland