Wetzikon

·

Built

1979

Terraced house Wetzikon, 1979

Gas heating replaced by a ground-source heat pump: the 1979 terraced house in Wetzikon got a 180 m borehole and has heated without fossil fuels since winter.

Terraced house in Wetzikon, built 1979

35 °C

Flow temp

Saving

CHF 1,900 per year

Before

Gas heating from 2004, 60 °C

After

Brine-to-water heat pump, 180 m borehole

Build time

3 weeks incl. drilling

Subsidy

CHF 14,200

Flow temp

35 °C

Drilling rig for the borehole in Wetzikon

Report

What we did

<p>The narrow garden had no room for an outdoor unit the neighbours would not hear, so the borehole was the quieter solution. We obtained the permit from the canton, and the drilling took two days.</p><p>Because the house already had underfloor heating, 35 degrees is enough. In summer the borehole gently cools the rooms at no extra cost.</p>

“

The drilling took two days. Afterwards the garden looked just like before.

Sandra and Luca Meier, Wetzikon